Sunday, November 14, 2010

Dalecarlia Tunnel

Last night I roughed in the Dalecarlia tunnel. The 300 foot long tunnel ran unde MacArthur Boulevard and the Washington Aqueduct.


I left the sides pretty steep for now until I have time to build the tunnel portals.  The top 2 layers of foam are  removable for track maintenance. For now the foam is painted black inside.  The bricks are holding everything in place while the glue dries.



2 comments:

  1. I have a sneaking suspicion that the aqueduct actually passes to the North of the tunnel where the railroad passes over a through girder bridge, number 14. The famous "bridge over nothing". Here's a bunch of pics: http://gallery.sluggyjunx.com/main.php?g2_itemId=62530

    ReplyDelete
  2. Hey Ben,
    I actually will be including the water where the pipe dumps out. I cut the foam after that picture was taken.

    ReplyDelete