Monday, November 8, 2010

Trolley Bridge - Part 1

Cutting the foam and roughing in the bridge over the trolley tracks. At the fascia I left a gap for the wires to run under foam boards.  Brown latex caulk is used as an adhesive.


0 comments:

Post a Comment